01
True runtime hours
Counter read straight off the controller — no more doctored logbooks, no more missed services.
Runtime hours, fuel level, start/stop events and remote diagnostics — straight from the generator controller over Modbus RTU. Built for telecom towers, mining camps and industrial sites.
GT AFRIK monitors diesel generators in the DRC and the Republic of the Congo. A Teltonika FMB125 reads DSE, ComAp or DATAKOM controllers over Modbus RTU and sends runtime hours, fuel level, battery voltage and alarms to a dashboard and to WhatsApp. During power cuts you can see how long each generator ran and how its fuel level moved. It is built for telecom towers, mining camps, bank branches, cold storage and hospitals.
Read the field guide: generator monitoringPaper logbooks say one thing. The controller says another. We read the controller.
01
Counter read straight off the controller — no more doctored logbooks, no more missed services.
02
Any suspicious tank drop fires a WhatsApp alert in about 60 seconds.
03
Every start timestamped, with cause: grid failure, test, manual. The full site history.
04
Voltage, temperature, oil pressure, controller alarms — without sending a technician 400 km.
05
All your gensets — 5 or 500 — on one screen, sorted by state and alert.
06
Consumption, hours, events per site. PDF/Excel export, in French or English.
Compatibility
DSE
Deep Sea Electronics
ComAp
InteliLite · InteliGen
DATAKOM
D-500 · D-700
Teltonika FMB125→ Modbus RTU · RS-485→ GT AFRIK Cloud + WhatsApp

Who runs on it
Diesel-powered towers and base stations — hundreds of sites, zero surprise visits.
Katanga camps and plants where the genset is the only power source.
Branches, cold storage, hospitals — anywhere an outage costs more than the diesel.
Generator monitoring by sector: telecoms, mining, banking and more
We read runtime hours, tank level, battery voltage and alarms from DSE, ComAp and DATAKOM controllers over Modbus RTU, straight from the generator controller.
Telecom operators running diesel-powered towers and base stations at remote sites; mining camps and plants in Katanga where the genset is the only power source; and banks, cold storage and hospitals — anywhere an outage costs more than the diesel.
Any suspicious tank drop fires a WhatsApp alert in about 60 seconds. Controller alarms are sent to the dashboard and to WhatsApp, and every start is timestamped with its cause: grid failure, test or manual. Dashboards, reports and support are available in French and English.
Each generator gets one Teltonika FMB125, wired to the controller in under two hours and live the same day. There is no long-term contract requirement. To start, request a demo or message +243 817 255 555 on WhatsApp.
One FMB125 per genset. Wired to the controller in under two hours. Live the same day.
Request Demo